Difference between revisions of "En-site NavX (St. Jude mapping)"

From TheInterWiki
Line 45: Line 45:
 
*Clip ground to other ground cables or suitable metal object
 
*Clip ground to other ground cables or suitable metal object
 
[[File:NavX7.jpg|thumb|150px|left|Ground]]<br style="clear:both" />
 
[[File:NavX7.jpg|thumb|150px|left|Ground]]<br style="clear:both" />
*One end of fiber optic cable is plugged into bottom fiber port below plugs from earlier step
+
*One end of fiber optic cable is plugged into bottom fiber port below plugs from earlier step marked "Precision"
 
[[File:NavX22.jpg|thumb|150px|left|Fiber cable plug]]<br style="clear:both" />
 
[[File:NavX22.jpg|thumb|150px|left|Fiber cable plug]]<br style="clear:both" />
 
+
*Other end of fiber cable plugs into St. Jude amplifier port marked "Precision"
 
+
[[File:NavX23.jpg|thumb|150px|left|Precision amplifier port]]<br style="clear:both" />
 +
===Secondary cart part 2===
 +
*Identify fiber cable on back of secondary cart
 +
[[File:NavX24.jpg|thumb|150px|left|Fiber cable secondary cart]]<br style="clear:both" />
 +
*Plug this cable into fiber port on St. Jude amplifier
 +
[[File:NavX25.jpg|thumb|150px|left|Fiber plug on amplifier]]<br style="clear:both" />
 +
*Identify black Ethernet cable near Maquette amplifier marked "Abbott Ensite"
 +
*Plug into back of Quartz unit on secondary cart
 +
[[File:NavX26.jpg|thumb|150px|left|Quartz unit Ethernet plug]]<br style="clear:both" />
  
 
[[File:STCarto11.jpg|thumb|150px|left|Power and ground cables]]<br style="clear:both" />
 
[[File:STCarto11.jpg|thumb|150px|left|Power and ground cables]]<br style="clear:both" />

Revision as of 01:19, 18 October 2023

Bring main and secondary NavX carts into room.

Secondary cart

  • Mount magnet to table plug side towards the foot of the table
NavX magnet plug
Mounted on table


  • Locate magnet cable on secondary cart and plug into magnet (arrows on plug will be toward the floor)
Magnet cable


Cable plug location


  • Locate power, ground, and fiber optic cable hanging on secondary NavX cart
Power, ground, fiber


  • Plug power cord into power outlet
Power


  • Ground, fiber, and data cables
Ground, data, fiber cables


  • Ground cable plugs into grounding block
Ground block


  • Two Fiber optic cables connect as shown. Orange cables on top, gray under
Fiber optic location


  • Serial data cable connects to left of fiber optic cables
Serial data cable


Main Cart

  • From second drawer of main cart unpack splitter unit
Splitter unit


  • Splitter unit is installed between pin-blocks and amplifier, also between ecg cable and amplifier
Splitter unit location


  • Unplug A,B,C cables from amplifier
Unplug pin-blocks


  • Replace with A,B,C cables from splitter
  • Repeat with ecg cable
  • A,B,C and ecg cables plug into splitter
A,B,C cables go here


  • Colored plugs from splitter connect to St. Jude amplifier on main cart
Splitter cables


  • From top drawer of main cart remove patch connection unit
Patch unit


  • Secure patch unit over table control as shown
patch unit location


  • Patch unit plugs into amplifier here
Patch unit plug location


  • Locate power, ground, and fiber cables on side of main cart
Cables on side of main cart


  • Plug in power cord
Power cord


  • Clip ground to other ground cables or suitable metal object
Ground


  • One end of fiber optic cable is plugged into bottom fiber port below plugs from earlier step marked "Precision"
Fiber cable plug


  • Other end of fiber cable plugs into St. Jude amplifier port marked "Precision"
Precision amplifier port


Secondary cart part 2

  • Identify fiber cable on back of secondary cart
Fiber cable secondary cart


  • Plug this cable into fiber port on St. Jude amplifier
Fiber plug on amplifier


  • Identify black Ethernet cable near Maquette amplifier marked "Abbott Ensite"
  • Plug into back of Quartz unit on secondary cart
Quartz unit Ethernet plug


File:STCarto11.jpg
Power and ground cables